Free Delivery Over £50*

Halny 1 & 2- Pitching Instructions

  1. Unpack the tent and lay out the flysheet and inner. (Note: The inner tent is already attached to the inside of the flysheet)
  2. Carefully assemble the alloy poles. Ensure all the joints are fully connected.
  3. Slide the main pole through flysheet pole sleeve, shown as the line on the diagram above.
  4. Insert each pole-end into the corresponding eyelet tab on the hem of the flysheet, tabs are located at points A and B on diagram above.
  5. Insert the short end poles in the red pockets, at each end under the flysheet vent covers.
  6. Peg out the end guylines first and adjust tension, then peg out the rest of the flysheet.
  7. Use 1 or 2 walking poles to support the awning feature

 

Halny Elite 1 is supplied with:

  • x1 main alloy pole
  • x2 endalloypoles
  • x11 ‘V’ alloy pegs.

 

Halny Elite 2 is supplied with:

  • x1 main alloy pole
  • x2 end alloy poles
  • x11 ‘V’ alloy pegs.